Bid Packages D-H (see container summary)
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
6 Volumes (Bid Package D, Site Utilities, Granite Construction (volume 2 of 2) Bid Package E, AC Paving (West), George Reed Bid Package F, AC Paving (East), Granite Construction Bid Package G, Site Concrete (West), Joseph J. Albanese (volumes 2 of 2) Bid Package H, Site Concrete (East) Joseph Albanese, Inc. (volume 1 of 2) )
Language of Materials
From the Record Group: English
Location
Castle Warehouse, Column 20, Overhead
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository