Specifications and Construction Documents, Bid Package 6, 100%, Alphabetical Bid Releases, UCM Controls
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
1 box (100% Construction Documents, 10/3/2003 Specifications, Bid Release L-O, Divisions 2-13, volume 2 of 3 Construction Documents, Bid Release A-H, 3/2005 Specifications, Bid Release I-K, Divisions 2-13, volume 2 of 3, 4/2005 Specifications, Bid Release I-K, Divisions 15-17, volume 3 of 3 UCM Controls Phase 1, volumes 1 and 2, 8/2003 Specifications, Bid Release A-H, volume 3 of 3, 3/2005 Addendum no. 2, UCM Controls Phase 1, volume 2 )
Language of Materials
From the Record Group: English
Location
Castle Warehouse, Large Shelf, B 6
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository