Skip to main content

Bid Packages 4.5, 2005

 File — Container: Ref ID ref21_rwb

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2005

Extent

2 folders (Campus 2005 Site Development And Infrastructure BP 4.5 Campus SMATV System, Site Development and Infrastructure Bid Package 4.5 800 MHz Radio System)

Language of Materials

From the Record Group: English

Location

Castle Warehouse, Cabinet 16, Topshelf

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479