Bid Package 5/6/7 Section 17050, 2005-02-03

 File — Container: Ref ID ref83_5nr

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2005-02-03

Extent

1 folder (Energy Management and Control System - General)

Language of Materials

From the Record Group: English

Location

Castle Warehouse, Cabinet 15, Drawer 2

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository