Bid Package 7 Schematic Design Specifications, 2003-04-11
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2003-04-11
Extent
1 folder (DIVISION 2 - SITE WORK DIVISION 3 - CONCRETE DIVISION 4 - MASONRY DIVISION 5 - METALS DIVISION 6 - WOOD AND PLASTICS DIVISION 7 - THERMAL AND MOISTURE PROTECTION DIVISION 8 - DOORS AND WINDOWS DIVISION 9 - FINISHES DIVISION 10 - SPECIALTIES DIVISION 11 - EQUIPMENT DIVISION 12 - FURNISHINGS DIVISION 13 - SPECIAL CONSTRUCTION DIVISION 15 - MECHANICAL DIVISION 16 - ELECTRICAL )
Language of Materials
From the Record Group: English
Location
Castle Warehouse, Cabinet 15, Drawer 2
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository