Bid Package 5 Specifications, 2003-02-12
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2003-02-12
Extent
1 folder (Specifications Listing for Bid Package 5: DIVISION 2 - SITE WORK Storm Drainage Flexible Pavement Rigid Pavement Curbs and Gutter DIVISION 16 - ELECTRICAL Wire and Cable Conduit Bridge Lighting Fixtures SPECIAL CALTRANS - BRIDGE RAILING SPECIAL PROVISIONS )
Language of Materials
From the Record Group: English
Location
Castle Warehouse, Cabinet 15, Drawer 2
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository