Geotechnical Investigation Report, University of California at Merced, Phase 1, On-Site Infrastructure - Merced County, California, 2002-09-17

 File — Container: Ref ID ref55_ncz

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2002-09-17

Extent

1 volume (Prepared for ARUP by Kleinfelder, INC)

Language of Materials

From the Record Group: English

Location

Castle Warehouse, Cabinet 5, Topshelf

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479