Skip to main content

DOF (Department of Finance) Submission Documents, 2003 - 2004

 File — Container: Ref ID ref322_b3o

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2003 - 2004

Extent

2 Volumes (Bid Package 5 Specs, 1/24/2003 Bid Package 6 100% Construction Document, 10/3/2003, issued for bid, 1/16/2004 )

Language of Materials

From the Class: English

Location

Castle Warehouse, Cabinet 16, Drawer 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479