Department of Finance (DOF) Approval Correspondence

 File — Container: Ref ID ref303_7a8

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

5 folders (Bid Release 2 Bid Release 1 P Phase Submission Bid Release 01 and 02 Bid Release 2.1 and 03 )

Language of Materials

From the Class: English

Location

Castle Warehouse, Cabinet 1, Drawer 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository