BP4 Boiler
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
1 volume (Informational, Spec Sections 15555 and 15556, TRC Test Report, Boilers and Burners Submittal to include controls, Enahncer Panel, Link Syste, Pumps and BFS Deaerator Submittal)