Construction Administration and Key Documents
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
3.3 Linear Feet (906000/0A Project File Index 906000/0B New releases/Photos 906000/0C Work Order/requisitions 906000/0D Owner Furnished Equipment 906000/0E Signage 906000/1A.1 Working Budget 906000/1A Capital Improvement Budget 906000/1B PPG Schedule 906000/1C Budget Correspondence 906000/1C.1 Drawdowns 906000/1D PPG 906000/1E DPP 906000/1E.1 Design Guide 906000/F Capital Planning Committee (Empty) 906000/F.1 Programming Consultant Correspondence (Empty) UC Merced 50% Design Specifications Vol 1 and 2 906000/1G Environmental Compliance. Environmental Monitor Daily Progress Report (3 Hanging Folders) 906000/1G.1 Archaeological Issues 906000/1H Site Planning Evaluation 906000/1H.1 Surveys (Empty) 906000/1H.2 Utilities 906000/1H.3 Building Guide (Empty) 906000/1H.4 Area Calculations (Empty) 906000/1H.5 Structural Calculations (Empty) 906000/1H.6 Energy Calculations (Empty) 906000/1H.7 Wind Analysis (Empty) 906000/1I Soils Report 906000/1J Cost Estimates David Langdon Adamson 906000/1J Cost Estimates Degenkolb 906000/1J Cost Estimates Independent 906000/1J Cost Estimates 906000/1J Cost Estimates Internal 906000/1J Cost Estimates Kleinfelder 906000/1J Cost Estimates Taylor Engineering 906000/1J Cost Estimates The Engineering Enterprise 906000/1K Office of President Correspondence 906000/1L Regents Items (Empty) 906000/1M Dept. of Finance Submission/SPWD 906000/1N DSA Access Compliance 906000/1O Asbestos Survey (Empty) 906000/1P Equipment (Empty) 906000/1Q Correspondence: Client BP 1 Demolition 906000/1Q Correspondence Client (Empty) 906000/1R Correspondence Campus 906000/1S Correspondence Consultant (Empty) 906000/1T Office of the General Counsel 906000/1U Fire Marshal 906000/1U.1 Fire Marshall Correction Notices 906000/1V LEED Documentation 906000/1W PG&E Savings by Design 906000/1W PG&E Savings by Design. BP 7 Corp. Yard Bldg. 906000/1X City/County Correspondence 906000/2A Design Proffessional Selection 906000/2B Design Professional Agreements 906000/2C Other Consultant Agreements (Empty) 906000/2C Other Consultant Agreements CSG 906000/2C Other Consultant Agreements DBI 906000/2C Other Consultant Agreements Degenkolb 906000/2C Other Consultant Agreements 4Leaf & Associates CTS 906000/2C Other Consultant Agreements Degenkolb 906000/2C Other Consultant Agreements FMC 906000/2C Other Consultant Agreements Degenkolb 906000/2C Other Consultant Agreements Gafcon 906000/2C Other Consultant Agreements Degenkolb 906000/2C Other Consultant Agreements Hanscomb 906000/2C Other Consultant Agreements Degenkolb 906000/2C Other Consultant Agreements Kleinfelder 906000/2C Other Consultant Agreements Degenkolb 906000/2C Other Consultant Agreements Signet 906000/2C Other Consultant Agreements Degenkolb 906000/2C Other Consultant Agreements SOM 906000/2C Other Consultant Agreements Degenkolb 906000/2C Other Consultant Agreements Taylor Engineering 906000/3A Correspondence- Design Professional 906000/3A Correspondence-To Design Professional 906000/3A Correspondence-From Design Professional 906000/3A.1 Correspondence-Other Consultants 906000/3B Correspondence-Campus (empty) 906000/3B.1 Correspondence-Users (Empty) 906000/3C Building Advisory Committee (Empty) 906000/3C.1 Miscelaneous Meeting Notes 906000/3D Value Engineering 3E Review Comments-Schematic Design Phase (SD) 3E.1 Review Comments-Design Devolpment (DD) phase 3E.2 Review Comments- Construction Documents Phase (CD) 3E.3 Revisions/Bulletins to Drawings Site and Infrastructure Bid Package 2 Site and Infrastructure Bid Package 4 3F Sole Source Justification 3G Design Professional Payment (2 Folders) 4A.4 Bid Summary & Docs Addendum (4 of 8) (Empty) 4A.2 Bid Summary & Docs (2 of 8) 4A.3 Bid Summary & Docs Pre-Bid (3 of 8) 4A.4 Bid Summary & Docs Addendum (4 of 8) 4A.5 Bid Summary & Docs bid (5 of 8) (Empty) 4A.6 Bid Summary & Docs Award (6 of 8) 4A.7 Bid Summary & Docs Closeout (7 of 8) )
Language of Materials
From the Record Group: English
Location
Castle Warehouse Cabinet 5, Drawer 1
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository