Skip to main content

Contracts Originals

 File — Container: Ref ID ref252_q3a

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

1 box (Part 2, Bid Package M, Volume 3 of 3, August 2005 Part 2, Bid Package M, Volume 2 of 3, August 2005 Part 2, Bid Package M, Volume 1 of 3, August 2005 Part 2, Bid Package L "Landscape," Volume 1 of 1, January 2006 Part 2, Bid Package K, Volume 1 of 3, April 2005 Part 2, Bid Package K, Volume 2 of 3, April 2005 Part 2, Bid Package J, Volume 3 of 3, April 2005 Part 2, Bid Package J, Volume 2 of 3, April 2005 Part 2, Bid Package K, Volume 3 of 3, April 2005)

Language of Materials

From the Class: English

Location

Castle Warehouse, Large Shelf, B 2

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479