Contracts Originals
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
1 box (Bid Package 4.5, 800 MHZ Radio System, January 2005 Bid Package 4.5 Campus SMATV System, July 2005 Bid Packages for Bid Release A-H, Bid Package D, Volume 1 of 3 Bid Packages for Bid Release A-H, Bid Package D, Volume 2 of 3 Bid Packages for Bid Release A-H, Bid Package D, Volume 3 of 3 Bid Packages for Bid Release A-H, Bid Package C, Volume 3 of 3 Bid Packages for Bid Release A-H, Bid Package C, Volume 2 of 3 Bid Packages for Bid Release A-H, Bid Package C, Volume 1 of 3 Bid Package 4.5, Emergency 911 Telephone System, January 2005 )
Language of Materials
From the Class: English
Location
Castle Warehouse, Large Shelf, T 3
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository