Construction Documents, Addendum #1, Geotechnical Engineering Investigation, Prequalification Documents, 2014-03-21
Scope and Contents
The project completed key phases of work related to the Section 404 permit conditions including: 1) construction of a dirt perimeter road to improve access to the outer areas of the campus and community; 2) construction of appropriate boundary fencing between the campus and preserve lands; 3) mass grading to improve storm water management; 4) construction of a kit fox bridge; and 5) salvage of impacted wetland soils. ENTIRE CAMPUS
Dates
- Creation: 2014-03-21
Extent
1 box (Prequalifications for Environmental Biological Consulting services. Statements of Qualifications Construction Documents, Volume 1, Division 1-31 Construction Documents, Volume 1 (marked as "Revised 8.2.11") Construction Documents, Volume 2 Division 1 Draft, 7.26.2011 )
Language of Materials
From the Class: English
Location
Castle Warehouse, Column 5, Overhead
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository