Found in 4 Collections and/or Records:
Hydrology and Hydraulic Calculations, 2002-02
File — Ref ID f105424*
Scope and Contents
From the Collection:
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates:
2002-02
UC Merced Master Site Credit Cupdate, LEED v2.2/v3.0, Sustainable Sites 6.1: Quantity and 6.2: Quality, 201403
File — Folder Ref ID 03cd93d*
Dates:
201403
UC Merced Storm Water Management System
File — Folder Ref ID 4677aae*
Volume Build Prototype Credit Certification Phase I, 2006-02
Record Group — Volume Ref ID 01713bc*
Dates:
2006-02