Arup
Organization
Found in 13 Collections and/or Records:
HVAC As-builts, 2009-01-22
Item — Ref ID 3a435ac*
Scope and Contents
From the Collection:
The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF...
Dates:
2009-01-22
Potable Water Pump Station, 2005-04-01, 2005-03-25
Item — Ref ID a6f3c54*
Scope and Contents
From the Collection:
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates:
2005-04-01; 2005-03-25
UC Merced Infrastructure, 100% Design Phase 1A, Grading Plan - Overall, 2002-07-03
Item — Object Ref ID 23da7db*
Scope and Contents
From the Collection:
In 1995, the Regents of the University of California selected a site in Merced County as the location for the University of California’s tenth campus. When construction began in 2002, the campus was determined to be a 21st century example of economic, social and environmental sustainability in the heart of the San Joaquin Valley.The UC Merced Physical Planning, Design and Construction Archives is committed to documenting the history and evolution of the built environment of...
Dates:
2002-07-03