Arup
Found in 13 Collections and/or Records:
100% CD Submittal, Arup, 2008-05-20
Office space primarly for Academic Affairs programs, TAs, Lecturers, Graduate Students
100% Construction Documents, 2008-07-08
The Merced campus sculpture titled "Beginnings" was created by the artist Aris Demetrios and is located on the main campus green (quadrangle) near the existing Science and Engineering 1 Building. The gift funded project is intended to represent the birth of UC Merced, the tenth campus in the University of California system that opened in Fall 2005. The metal sculpture is about 40 feet tall and sits on a grassy quadrangle in front of the Science and Engineering 1 Building.
100% Construction Documents, ARUP, 2008
The UC Merced Early Childhood Education Center (ECEC) serves the young children of the students, staff, and faculty of UC Merced and a number of community children with high quality early care and education. The ECEC follows the campus calendar and is open year-round. The center serves infants, toddlers and preschoolers.
Bid Package 4 Drawings, Arup, 2002-09-27
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Bid Package 4, Specifications, 20020927
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.
Bulletin 121, 2006-04-11
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Construction Documents for Infrastructure, TP 6.3.2-1, 6.3.2-2, 6.3.2-3, Volumes 1-2, 200701
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.
Donor Elements Site Plan, 2001-12-14
ECEC Construction Documents, ARUP North America Ltd, 2008-05-28
Fire Sprinkler Hydraulic Calculations & Material Submittals , 2004-03-24 - 2004-10-13
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.