Skip to main content

Prequalification Documents, Environmental Biological Consulting (see container summary), 2011-03-31

 File — Container: Ref ID 65556a4*

Scope and Contents

From the Collection:

The project completed key phases of work related to the Section 404 permit conditions including: 1) construction of a dirt perimeter road to improve access to the outer areas of the campus and community; 2) construction of appropriate boundary fencing between the campus and preserve lands; 3) mass grading to improve storm water management; 4) construction of a kit fox bridge; and 5) salvage of impacted wetland soils. ENTIRE CAMPUS

Dates

  • Creation: 2011-03-31

Extent

7 folders (Area West Environmental, Inc., PES Environmental, Analytical Environmental Services, ICF International, H.T. Harvey & Associates, Salem Engineering Group, Inc.)

Language of Materials

From the Class: English

Physical Location

For transport to Castle

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479