Skip to main content

Geotechnical Engineering Investigation Proposed Bridge Construction Sites & Succulent Owls Clover Survey Results Report, 2011-06 - 2011-07

 File — Container: Ref ID 042e5c4*

Scope and Contents

From the Collection:

The project completed key phases of work related to the Section 404 permit conditions including: 1) construction of a dirt perimeter road to improve access to the outer areas of the campus and community; 2) construction of appropriate boundary fencing between the campus and preserve lands; 3) mass grading to improve storm water management; 4) construction of a kit fox bridge; and 5) salvage of impacted wetland soils. ENTIRE CAMPUS

Dates

  • Creation: 2011-06 - 2011-07

Extent

1 folder (Salem Engineering Group Geotechnical Engineering Investigation Proposed Bridge Construction Sites Pre-Construction Survey Results Report for succulent owls clover, San Joaquin Valley or Cutt Grass and Colusa Grass)

Language of Materials

From the Class: English

Physical Location

For transport to Castle

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479