Preliminary Record Drawings, Stantec, 2010-12
Scope and Contents
The project completed key phases of work related to the Section 404 permit conditions including: 1) construction of a dirt perimeter road to improve access to the outer areas of the campus and community; 2) construction of appropriate boundary fencing between the campus and preserve lands; 3) mass grading to improve storm water management; 4) construction of a kit fox bridge; and 5) salvage of impacted wetland soils. ENTIRE CAMPUS
Dates
- Creation: 2010-12
Extent
49 Sheets (Drawings Include: Site Grading and Erosion Control Plan Kit Fox Canal Crossing Location Erosion Control Details Fence Details Bridge Plan View) ; 18" x 24"
Language of Materials
From the Class: English
Physical Location
Castle Warehouse, Large Drawing Cubbies, Cubby 22
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository