Skip to main content

Structural Calculations, Eric Picciano, P.E.

 Item — Container: Ref ID 51e26e4*

Scope and Contents

From the Collection:

The project completed key phases of work related to the Section 404 permit conditions including: 1) construction of a dirt perimeter road to improve access to the outer areas of the campus and community; 2) construction of appropriate boundary fencing between the campus and preserve lands; 3) mass grading to improve storm water management; 4) construction of a kit fox bridge; and 5) salvage of impacted wetland soils. ENTIRE CAMPUS

Dates

  • Creation: Summer 2013

Extent

2 Volumes (2 email correspndence, subject: Review of plans for Kit Fox Bridge 20120111 1 Kit Fox Bridge Structural Calculations plans 20120112 2 Kit Fox Bridge Structural Calculations plans 20120109 3 Shop Drawings by Eric Picciano, P.E.)

Language of Materials

From the Class: English

Physical Location

Castle Warehouse, Large Drawing Cubbies, Cubby 22

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479