Construction Documents Vol 2 & 3, 2005-04
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2005-04
Extent
1 folder (Vol 2 Contains Divisions 2 - 13 Specifications for Bid Release No. I-J-K Vol 3 Contains Divisions 15 - 17 Specifications for Bid Release No. I-J-K)
Language of Materials
From the Class: English
Physical Location
Castle Warehouse, Cabinet M8, Drawer 2
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository