Bid Package 3, 2008 Development and Infrastructure Design As-Builts, 2003-02-14

 Item — Container: Ref ID ae2ac27*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street... paving. [Completed in 2005]

See more

Dates

  • Creation: 2003-02-14

Extent

129 Sheets ; 24" x 18"

Language of Materials

From the Class: English

Collapse All

Physical Location

Design and Construction Trailer, Gareth Beilby's Office, Checked out material

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479