Bid Package 3, 2008 Development and Infrastructure Design As-Builts, 2003-02-14
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street... paving. [Completed in 2005]
See moreDates
- Creation: 2003-02-14
Extent
129 Sheets ; 24" x 18"
Language of Materials
From the Class: English
Physical Location
Design and Construction Trailer, Gareth Beilby's Office, Checked out material
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository