As Builts, Bid Package A, Earthwork, DSA Dry Signature, 2004-04-26

 Item — Container: Ref ID f6d7f90*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2004-04-26

Extent

73 Sheets (Earthwork) ; 24" x 36"

Language of Materials

From the Class: English

Physical Location

Castle Warehouse, Large Drawing Cubbies, Cubby 22