Pre Qualification Documents (see container summary), 2002 - 2003
Scope and Contents
Auditorium; lecture halls, classrooms, conference rooms, offices, for I.T., SSHA, Academic Support Units
Dates
- Creation: 2002 - 2003
Extent
1 folder (Prequalification Long/Short Form (Competitive Bidding): 900100/4B.1 Prequalification Documents Correspondence/General (1 of 5) 900100/4B.2 Prequalification Documents Masters (2 of 5) 900100/4B.3 Prequalification Conference (3 of 5) 900100/4B.4 Prequalification Addendum (4 of 5) 900100/4B.5 Prequalification Submittals (5 of 5) (x4) CM/Contractor Documents July 2003 Mauldin-Dorfmeier Construction, Inc. Qualification for COB (07.31.03) - Dispositioned 900100/4B.5 Prequalification Submittals (5 of 5) (x3) - Rejected submittals dispositioned)
Language of Materials
English
Physical Location
Castle Warehouse, Cabinet 2, Drawer 1
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository