 File — Container: Ref ID 40c9494*

Scope and Contents

From the Collection:

The Student Housing Phase 3 is composed of approximately 57,940 assignable square feet/84,130 gross square feet in two four-story buildings on the campus at Scholars Lane between Emigrant Pass and Mammoth Lakes Road, just to the west of the Valley Terraces student housing complex. The Student Housing Phase 3 project accommodates primarily freshmen in its residence halls. The project site comprises approximately one acre of a two-acre site that was an interim student resident parking lot. After construction is complete, a portion of the parking lot is expected to be retained until a future student housing project begins construction (currently anticipated to start in 2012). Building A contains a combination of residential space and study/program space. The programming space on the ground floor is planned to accommodate multi-purpose meeting rooms, office, and support space. The three floors above are residential floors. Building B is primarily residential on four floors with a small amount of administrative space on the ground floor. The two buildings combined house 306 - 320 dormitory beds, including a minimum of 290 double-occupancy and 16 single occupancy bedrooms. This includes 300 revenue beds (290 double occupancy and 10 single occupancy bedrooms). There are six non-revenue beds for Resident Assistants. Most or all of the revenue double bedrooms can accommodate triple occupancy when necessary. The project includes site development and infrastructure, as well as landscape and hardscape space to the north of the buildings for casual and programmatic uses by the student residents. The Student Housing Phase 3 project is built on a portion of the 307-space resident parking lot. During construction, none of the original 307 spaces were available for parking; 209 spaces were provided elsewhere, leaving a temporary shortfall of 98 spaces. Approximately 71 spaces in the northerly portion of the resident lot will be returned to service at completion of the project, and until the Student Housing Phase 4 project is constructed.

Dates

  • Creation: Between 2008 and 2011

Extent

1 box (0001-03 3000 Concrete Mix Design 0013-06 4100 Architectural Wood Casework (no content) 0014-06 64100 Casework Shop Drawings 0001 05 5500 Dry Pack Grout 0012-06 6400 Plastic Paneling 0011-08 7113 Automatic Door Operators 0016-09 2216 Non-Structural Metal Framing 0001 07 2100 Thermal Insulation 0017-09 2900 Gypsum Board 0002 09 2900 Gypsum Board Trim 0002 09 6750 Resinous Flooring Color Sample 0008-09 9000 Paint Brush Outs (no content) 0008-09 9000-2 Paint Brushout 0003-09 9000-1 Painting 0003-09 9000 Painting Product Data 0009-08 7100 Finish Door Hardware 0001 10 1400 Signage 0001 10 2600 Wall & Dr Protectors 0001 21 1313 Wet Pipe Sprinkler System DBCI-0001 Concrete Demo DBCI-002 Add Fan Coil DBCI-003 Insta-Hot water DBCI-004 Exhaust Duct DBCI-005 DBCI-006 0003 09-9000-1 Painting 0004-26 0519 Electrical Rough-in Low Voltage 0005-26 0533 Electrical Rough-in Material 0002 26 2726-1 Electrical Outlet 0006-26 2726 Electrical Rough-in Wire 0002-26 5000-1 Light Fixtures 0002-26 5000 Light Fixtures 0007-28 3100 Fire Alarm Garranty/Warranty for D Batty Inc., Ro's Precise, and Michael Cole Electric Fire Alarm System Close-out Documentation, Tri Signal Integration, Inc.)

Language of Materials

English

Physical Location

Castle Warehouse, Column 27, Overhead

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479