Submittals, 27 0526-0001-0 thru 33 7900-0001-0
Scope and Contents
The Student Housing Phase 3 is composed of approximately 57,940 assignable square feet/84,130 gross square feet in two four-story buildings on the campus at Scholars Lane between Emigrant Pass and Mammoth Lakes Road, just to the west of the Valley Terraces student housing complex. The Student Housing Phase 3 project accommodates primarily freshmen in its residence halls. The project site comprises approximately one acre of a two-acre site that was an interim student resident parking lot. After construction is complete, a portion of the parking lot is expected to be retained until a future student housing project begins construction (currently anticipated to start in 2012). Building A contains a combination of residential space and study/program space. The programming space on the ground floor is planned to accommodate multi-purpose meeting rooms, office, and support space. The three floors above are residential floors. Building B is primarily residential on four floors with a small amount of administrative space on the ground floor. The two buildings combined house 306 - 320 dormitory beds, including a minimum of 290 double-occupancy and 16 single occupancy bedrooms. This includes 300 revenue beds (290 double occupancy and 10 single occupancy bedrooms). There are six non-revenue beds for Resident Assistants. Most or all of the revenue double bedrooms can accommodate triple occupancy when necessary. The project includes site development and infrastructure, as well as landscape and hardscape space to the north of the buildings for casual and programmatic uses by the student residents. The Student Housing Phase 3 project is built on a portion of the 307-space resident parking lot. During construction, none of the original 307 spaces were available for parking; 209 spaces were provided elsewhere, leaving a temporary shortfall of 98 spaces. Approximately 71 spaces in the northerly portion of the resident lot will be returned to service at completion of the project, and until the Student Housing Phase 4 project is constructed.
Dates
- Creation: Between 2008 and 2011
Extent
3.3 Linear Feet (H3 As Builts Submittals: 27 0526-0001-0 Communications Bonding 27 0533-0 Commun. Cable Tray 27 0533-2 Commun. Cable Tray 27 0533-3 Comm. Cable Tray 27 0811-0001-0 Comm. Twisted Pr Testing 27 1100-0001-0 Communications Rms 27 1313-0001-1 Comm. Backbone ISP Cable 27 1314-0001-0 Com. Backbone OSP Cablg 27 1314-0002-0 Com. Backbone OSP Cablg 27 1323-0001-0 Com.Backbone ISP Cablg 27 1323-0002-0 Comm. Backbone ISP Fiber Optic Cabling 27 1324-0001-0 Com.backbone OSP Fiber 27 1324-0002-0 Com.Backbone OSP Fiber 27 1333-0001-0 Com.BackboneCoaxi 27 1513-0001-0 Com.Horizontal Cablg 27 1533-0001-0 Com.Horizontal Cablg 27 4116-0001-0 Integrated Audio/Video 27 4116-0001-1 Integrated Audio/Video 27 4116-0002 Integrated Audio/Video 31 2000-0001-1 Earthwork 32 0540-0001-0 Joint Sealants for Civil Wk 32 0540-0001-1 Jt Sealants for Civil Wk 32 0590 Protective Coating 32 1123-0 Aggregate Base 32 0540-0001 Jt Sealants for Civil Wk 32 1123-0001-0 Aggregate Base Course 32 1200-0001-0 Flexible Pavement 32 1243-0001-0 Flexible Porous Paving 32 1314-0001-0 Landscape Concrete 32 1314-0002-0 Landscape Concrete 32 1314-0003-0 Land.Concr,Form Liner 32 1314-0004 Land. Concr,Curing Comp 32 1314-0005 Landscape Concrete 32 1314-0006 Land.Concr, Form Liner 32 1314-0007-0 Land.Concr,Traf.CntrPln 32 1314-0008-1 Land.Concr,Traf.Cntr Pln 32 1443-0001 Porous Unit Paving 32 1700-0001 Paving Specialties 32 3010-0001 File 1, Land.Struct.Anch.Blt 32 3010-0001 File 2, Land.Struct.Anch.Blt 32 3010-0001-0 Land. Struct.Anchor.Blt 32 3010-0002-0 Landscape Structures 32 3010-0003 Land.Structure Trex 32 3010-0004-0 Land.Struct.Cab.Trellis 32 3010-0005-0 Landscape Structures 32 3010-0006-0 Landscape Structures 32 8400-0002-0 Irrig.Horizon Ltr of Accep 32 8400-0001-0 Irrigation 32 8400-0001-1 Irrigation 32 9000-0001-0 Planting 32 9000-0001-2 Planting 32 9000-0001-3 Planting 33 0513-0 Concrete Manholes 33 0514-0 Manhole Frames & Cover 33 0532-0 Reinforcing Steel-Civil 33 0533-1 CIPC -Grout 33 0533-01-05 Concrete Mix Designs 33 0533-2 Mix Design Collins 33 0533-3 CIPC Grout HPS 33 0533-0001-0 CIP Concrete -Civil Wk. V33 1000 Potable Water 33 1000-2 Pot. Water Sys. ShopDrwg 33 1000-3 Potable Water 33 1000-4 Pot. Water Bell Restraints 33 1000-5 Pot. Water Gate Valves 33 1000-6 Potable Water Gaskets 33 1000-7 Reduced Pres. Backfl Prev 33 1000-0001 Potable Water Sys 33 1120 Recyc. Water Sys 33 1300-0 Disinfection Testing 33 3000 Sanitary Sewer 33 30000-2 Sanitary Sewer Shp Drwg 33 40000-2 Storm Drainage Shop Drw 33 4000-0001-0 Storm Drainage 33 4000-0002-0 Storm Drainage 33 5100 Natural Gas System 33 5100-1 Natural Gas 33 5100-2 Natural Gas Sys. Prod. Dta 33 6000 Hydronic Energy 33 6000 Hydronic Energy (2) 33 6000-1 Hydr. Energy/Weld.Qualif. 33 6000-2 Hydronic Energy 33 7119-0&1 Underground Electrical 33 7119-2 Underground Elec.Drwgs 33 7123-0001-0 Medium Voltage Cable 33 7123-0002 Medium Voltage Cable 33 7123-0003 Medium Voltage Cable 33 7123-0004 Med.Volt.Cbl.Traf.Control 33 7123-0005-0 Med.Voltage Cable Final 33 7313-0001-0 Padmount Transformer 33 7313-0002-0 Padmount Transf.Test 33 7727-0001-1 Subs.Mntd Vacuum Inter 33 7726-0001-0 Padm Source Transf Sw 33 7727-0002-1 Subs Padmt 4-Way Vac. S 33 7727-0003-0 Subs.Mt.Vac.Inter.Switch 33 7900-0001-0 Electrical Grounding)
Language of Materials
English
Physical Location
Castle Warehouse, Cabinet 27, Drawer 1
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository