Submittals 21 13 13 - 22 14 13
Scope and Contents
The Student Housing Phase 3 is composed of approximately 57,940 assignable square feet/84,130 gross square feet in two four-story buildings on the campus at Scholars Lane between Emigrant Pass and Mammoth Lakes Road, just to the west of the Valley Terraces student housing complex. The Student Housing Phase 3 project accommodates primarily freshmen in its residence halls. The project site comprises approximately one acre of a two-acre site that was an interim student resident parking lot. After construction is complete, a portion of the parking lot is expected to be retained until a future student housing project begins construction (currently anticipated to start in 2012). Building A contains a combination of residential space and study/program space. The programming space on the ground floor is planned to accommodate multi-purpose meeting rooms, office, and support space. The three floors above are residential floors. Building B is primarily residential on four floors with a small amount of administrative space on the ground floor. The two buildings combined house 306 - 320 dormitory beds, including a minimum of 290 double-occupancy and 16 single occupancy bedrooms. This includes 300 revenue beds (290 double occupancy and 10 single occupancy bedrooms). There are six non-revenue beds for Resident Assistants. Most or all of the revenue double bedrooms can accommodate triple occupancy when necessary. The project includes site development and infrastructure, as well as landscape and hardscape space to the north of the buildings for casual and programmatic uses by the student residents. The Student Housing Phase 3 project is built on a portion of the 307-space resident parking lot. During construction, none of the original 307 spaces were available for parking; 209 spaces were provided elsewhere, leaving a temporary shortfall of 98 spaces. Approximately 71 spaces in the northerly portion of the resident lot will be returned to service at completion of the project, and until the Student Housing Phase 4 project is constructed.
Dates
- Creation: Between 2008 and 2011
Extent
1 box (21 1313 0006 0 Wet Pipe Sprinkler Systems 21 2100 0 Fire Suppression Standpipes 22 0050 0001 0 Basic Plumbing 22 0518 0 Escutcheons for Plumbing Piping 22 0519 0 Meters Gauges for Plumbing Piping 22 0523 0 Duty Values Plumbing Piping 22 0523 0001 1 Duty Values Plumbing Piping 22 0529 0 Hangers Support Plumbing Piping Equipment 22 0529 0001 0 Hangers Support Plumbing Piping 22 0548 0 Vibration Seismic Controls Plumbing Equipment 22 0548 0001 0 Vibrations Seismic Control Plumbing Equipment 22 0553 0 Identification Plumbing Equipment 22 0553 0001 0 Identification Plumbing Equipment 22 0700 0 Plumbing Installation 22 1116 0 Domestic Water Piping 22 1116 1 Domestic Water Piping 22 1116 2 Domestic Water Piping 22 1119 0 Domestic Water Piping Specialties 22 1119 001 0 Domestic Water Piping Specialties 22 1123 0 Domestic Water Piping 22 1223 0 Facility Indoor Potable Water Storage Tanks 22 1316 0 Sanitary Waste Vent Piping Shop Drawings 22 1316 1 Sanitary Waste Vent Piping PVC 22 1316 2 Sanitary Waste Vent Piping Product Data 22 1316 3 Sanitary Waster Vent Piping 22 1319 0001 0 Sanitary Waste Piping Specialties 22 1413 0 Facility Storm Drainage Piping 22 1413 1 Facility Storm Drainage Piping)
Language of Materials
English
Physical Location
Castle Warehouse, Large Shelf, B4
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository