Bid/Plan Check Set, 2005-02-08
Scope and Contents
Change Order to Housing and Dining project. Design Build WC combined. This project provides food service facilities for students, faculty, staff and visitors. The project constructs the core and shell facility for dining (11,050 asf), as well as provide additional tenant improvements for the adjacent convenience store (1,000 asf) and a small operation to be located within the Library/Information Technology Center (700 asf).
Dates
- Creation: 2005-02-08
Extent
41 Sheets (Sheet count is an approximation Architectural, mechanical, plumbing, electrical, food service) ; 17" x 22"
Language of Materials
English
Physical Location
Castle Warehouse, Fire Cabinet 1, Drawer 4
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository