2_2_1 CEQA-NEPA
Record Group
Scope and Contents
From the Collection:
Extension of buried Utilities in the Campus Academic Core. Improve Quality of Classroom Space by Installing Audio/Visual and Instructional Tech Equipment. Permanent location for Campus Corporation Yard and Vehicular Access. Permanent Improvements to Ranchers Road. Telecom Building HVAC and Electrical System Improvements. Pump Station Pressure and Filtration Improvements.
Dates
- Creation: 09/06/2013
Extent
From the Class: 20 Linear Feet (At this writing this number is just an estimate, 3.24.14, JT.)
Language of Materials
English
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository