100% Construction Documents, Bid Plan Check Set (Food Service), 2004-11-29
Item — Container: Ref ID 8d31f3f*
Scope and Contents
From the Collection:
Change Order to Housing and Dining project. Design Build WC combined. This project provides food service facilities for students, faculty, staff and visitors. The project constructs the core and shell facility for dining (11,050 asf), as well as provide additional tenant improvements for the adjacent convenience store (1,000 asf) and a small operation to be located within the Library/Information Technology Center (700 asf).
Dates
- Creation: 2004-11-29
Extent
1 volume
Language of Materials
English
Physical Location
Castle Warehouse, Large Drawing Cubbies, Cubby 2
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository