Construction Administration Miscellaneous (see container summary)
Scope and Contents
The overarching vision of the Library is to merge previously distinct elements into a synergistic whole. Technology is integrated into day-to-day University life, so that coursework, homework, and research become a single activity. Libraries were traditionally considered repositories for storing scarce resources such as expensive books or specialized journals. As technology has developed, however, more and more of these scarce resources are becoming plentiful in a digital format. Space is provided for: Campus Reading Room; Service/Circulation Desk & Copy Services; Service/Circulation Desk; Reserve Collection; Media Collection; Information Commons; Reference Desk; Reference Collection; Academic Support Staff Offices; Computer Workstations; Computer Labs; Collaborative Workrooms; Library Instruction & Media Hub; Flexible Instruction; Conference Rooms; Multi-use Room; Periodicals/New Books Reading Room; Archives/Special Collections; Book-stacks; Library Administration; Cataloging; Books/Serials Processing; I.T. Systems Office; Interlibrary Loan; Mail, Sorting, Shipping Area; Campus Administration and Student Services.
Dates
- Creation: Between 2001 and 2005
Extent
3.3 Linear Feet (Kleinfelder Geotechnical Investigation Report, Library, Science, Classroom and Central Plant Building Kleinfelder Draft Geotechnical Investigation Report, Library, Science, Classroom and Central Plant Building Dinyari Inc. Construction Documents for CermaFlex 100 System Rex Moore Construction Documents for Electrical Work Rooms 232, 209, 217 George Reed Construction Documents for Completion of Hardscape and Handicap Improvements CM/Contractor Documents (Incomplete) CM/Contractor Documents (Incomplete) Bid Release 2, Volume 2, Divisions 1-14 Bid Release 2, Volume 3, Divisions 15-16 Detailed Project Program, EHDD Architecture Basis of Schematic Design DSA Approval Submittal, Volume 1, Divisions 1-14 DSA Approval Submittal, Volume 2, Divisions 15-16 DSA Approval Submittal, Volume 3, Lighting Fixture Schedule/Cut Sheets Bid Release 1, Addenda 1-9 (Stamped Original) Issued for Bid, Volume 4, Lighting Fixture Schedule/Cut Sheets 50% CD AutoCAD R2002 and 50% CD Specifications (CD) Level 2 Pre-Qualification Documents Change Orders 29-30, Volume 10 of 13 (Digitized and saved to Box and DSpace) Change Orders 31-31, Volume 11 of 13 (Digitized and saved to Box and DSpace) Change Orders 33-34, Volume 12 of 13 (Digitized and saved to Box and DSpace) Change Orders 35-36, Volume 13 of 13)
Language of Materials
From the Class: English
Location
Castle Warehouse, Cabinet 6, Topshelf
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository