SWPPP, 2012-03-16
Dates
- Creation: 2012-03-16
Creator
- A M Stephens (Organization)
Extent
1 volume (Construction General Permit Submitted Permit Registration Docs SWPPP Amendments and Amendment LOG NAL Exceedance Site Evals Submitted Changes to PRDS Construction Schedule Construction activities, amterials used and associated pollutants CASQA BMP handbook Fact Sheets Visual Inspection Field Log Sheet Risk Level 1-3 Effluent Sampling Field Log Sheets Risk Level 2 Agency Approvals and Misc Docs Training Reporting Form Responsible Parties Contractors and Subcontracting BMP Consideration Checklist Construction Records Rain Event Action Plan Form Test Methods, Detection Limits, Reporting Units, Applicable Nals and Nels Applicable to Risk Level 2 Erosion Contorl Plan Constrcution Site Monitoring Program Contractor Activities Location Map Bioassessment Summary and Resources)
Language of Materials
From the Record Group: English
Physical Location
Promenade, Suite C, Archives Cabinet 2, Topshelf
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository