Construction Administration Documents
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: December 2006
Extent
3.3 Linear Feet (Outside Plant Communication Cabling Delta Wireless 911 Emergency Telephone System Work Order Requisitions Administrative Matters Budget Correspondence PreQualification long/short Form (Competitive Bidding) 4.5 MHZ Radion System Delta Wireless - Bid Summary Documents Construction Trade Package 1A Earthwork - Correspondence Contractor; Insurance Project Closeout - Certificates of Completion/Notice of Completion Prequalification Long/Short Form Competitive Bidding Construction Trade Package 1A Earthwork - Field Orders, Correspondence, Insurance Notice of Completion Bidding Phase Long/Short Form (Competitive Bidding and Brief Form) Prequalification Submittals Inspection Reports Insurance Project Meeting Minutes Testing Reports Concrete Certificates of Completion)
Language of Materials
From the Class: English
Physical Location
Castle Warehouse, Cabinet 20, Drawer 3
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository