Project Manual, BR-6, Volumes 1-3, Contract Documents Addenda "A" and 1, and Architect's Supplemental Instructions, 20090901
Item — folders: 41b4849*
Scope and Contents
From the Collection:
Collection is contained in separate brown bags for each plan set. Title is written in black marker on each bag, including Project, document phase, and date.
Dates
- Creation: 20090901
Creator
Extent
3 Volumes (Volume 1: Division 00 - Procurement and Contracting Requirements; Division 01 - General Requirements Volume 2: Divisions 00 & 01 (Partial); Division 02 Through 14 Volume 3: Divisions 21 Through 33)
Language of Materials
English
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository