AsBuilts 15900, 2012-11-30
Dates
- Creation: 2012-11-30
Extent
146 Sheets (Title Page Table of Contents Symbol Legend Abbreviation/ Installation Notes Cable Specification Chart Summary Bill of Materials Building Layout West EMCS Network Riser East EMCS Network Riser AC Unit Interface AC unit Temperature Monitoring Intelligent Diffuser Intelligece/Wiring Detail Power Monitoring System Interface Water Heater Interface Fire/ Smoke Damper Power Plan EMCS 120 VAC Power Schedule ZN Pwr West (EMP 5-19,5-22) Accutherm PWR West (EMP 5-10,11) ZN/Accutherm PWR East (EMP 5-30,31) VAV Details -Typical of 37 VAV w/Window Switch -Typical of 6 VAV Schedule VAV Terminal SOO AFCT Details -Typical of 68 AFCT Laboratories- Typical of 25 AFCT R-2 (NMR Mass 020) AFCT B-6 (Titan Rm 090B) AFCT B-21 (Material Science Rm 080B) AFCT B-23 (CER Rm 050H) AFCT B-33 (Server Tech Rm 030) AFCT Schedule A AFCT Schedule B AFCT Temperature Control SOO Window Switch Monitoring EMP 5-1 (Gateway /Arcnet Routers) EMP 5-1 Continuation EMP 5-2 (West 2nd Floor Arcnet Router) EMP 5-2 Continuation EMP 5-3(East 2nd floor arcnet router) EMP 5-4 (West 1st Floor arcnet Router) EMP 5-5 (AHU-1) Typical for EMP 5-8 EMP 5-5 Continuation A EMP 5-5 Continuation B AHU-1 (Typical for AHU-2) AHU-1 Supply Fan Wiring Details AHU-1 VFD Wiring Details AHU 1 (AHU-2) SOO EMP 5-6 (AHU 3) EMP 5-6 Continuation A EMP 5-6 Continuation B EMP 5-6 Continuation C AHU-3 AHU-3 Supply / Return Fan Wall Details AHU-3 VFD Wiring Details AHU-3 SOO EMP 5-7 (Lab EF's 1&2, HR Pumps) EMP 5-7 Continuation A Lab Exhaust Fans 1&2 Lab Exhaust VFD/HR Pump Wiring Details Lab EF 1,2 System SOO Solar Panel BTU Meters EMP 5-9 (AHU-4, EF's 3,4,5 &8) EMP 5-9 Continuation A EMP 5-9 Continuation B EMP 5-9 Continuation C EMP 5-9 Continuation D AHU-4 AHU-4 Supply/Return Fan Wall Details AHU-4 VFD Wiring Details AHU-4 SOO EF 3 EF 3 SOO EFs 4&5 EFs 4&5 SOO EF & VFD Wiring Details EF 8 VFD Wiring Details EF SOO EMP 5-12 (DHW/IHW, Misc Plumbing) EMP 5-12 Continuation A Domestic Hot Water System Industrial Hot Water System DHW/IHW SOO Misc Plumbing & Monitoring EMP 5-13 (AHU-5, EF-6, SF-8) EMP 5-13 Continuation A AHU-5 AHU-5 VFD & SF/EF Wiring Details AHU-5 & SF-8 SOO EMP 5-14 (AHU-6) EMP 5-14 Continuation A AHU-6 AHU-6 VFD Wiring Details AHU-6 SOO EF 6 SOO EMP 5-15 (AHU-7,EF-7) EMP 5-15 Continuation A AHU-7/EF-7 AHU-7/EF-7 VFD Wiring Details AHU-7/EF-7 SOO EMP 5-16 (CHW Systems) EMP 5-16 Continuation A EMP 5-16 Continuation B Primary CHW System Process CHW System Server CHW System CHW System VFD Wiring Details CHW System SOO ATS Monitoring AST SOO EMP 5-18 (HW Systems) EMP 5-18 Continuation HW System Heating HW System HW System VFD Wiring Details HW System SOO EMP 5-27 (090G/090B Gas Monitoring) Prep 090G/Titan 090B Wiring Details EMP 5-28 (Rm 080 Gas Monitoring) Material Science Rm 080B Wiring Details A Material Science Rm 080B Wiring Details B EMP 5-29(NMR Rm 020 Gas Monitoring ) NMR Rm 020 Wiring Details EMP 5-32 (HR Rm 110A Gas Detection) H2 RM 110A Wiring Details Misc. Plumbing SOO LCP-BELCPA LCP-1WLCPA LCP-2WLCPA LCP-3WLCPA Irrigation Flow Meter Onicon Meter Installation & Wiring Details Valve Schedule Page A Valve Schedule Page B Valve Schedule Page C Valve Schedule Page D Valve Schedule Page E Valve Schedule Page F Valve Schedule Page G Valve Schedule Page H Valve Schedule Page I Valve Schedule Page J Installation Details A Installation Details B Installation Details C) ; 11.5 " x 14"
Language of Materials
From the Class: English
Location
For transport to Castle
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository