The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility will be located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock. The project is scheduled to be completed in time for Fall 2008.
The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility is located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock.
Dates
- Creation: Between 2007 and 2008
Extent
1 box (5D Change Order Requests 5E Change Orders 5I Request for Infomation 5J Baseline Construction Schedules/Correspondence, Acme Construction 5J.1 Constructon Schedules Correspondence 5M Correspondence Design Professional 5M.1 Correspondence CTE Test and Engineering 5N Correspondence Client 5N.1 Correspondence Campus 5O Correspondence Contractor 5P Notice of Compliance 5P.1 Superindendent Daily Reports 5P.3 Final Certification Geotechnical Investigation 5P.11 Final Certification Mechanical Certs 5Q Inspection Reports IOR 5R.5 Project Report 5V Subcontractor List 5W Submittal Log 5X.6 LEED Construction 5X.8 SWPP 5A Legal Matters 5Z Transition to Site )
Language of Materials
From the Collection: English
Location
Castle Warehouse, South Drawing Bay, Large Shelf, B 8