Skip to main content

RFIs, Field Orders, Meeting Minutes (see container summary), 2007-01

 File — Container: Ref ID ref50_5fy

Scope and Contents

From the Collection:

The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility will be located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock. The project is scheduled to be completed in time for Fall 2008.

Scope and Contents From the Collection:

The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility is located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock.

Dates

  • Creation: 2007-01

Extent

1 box (Submittals, M. Santos & Sons Plumbing PTC Weekly Meeting Minutes, 6/14/2007 - Field Orders RFIs, TP6-0001 to TP6-0100 Bid Package 4.5 Cabling Hallmark Group Construction Documents, TPK 6.3.2-1, 6.3.2-2, 6.3.2-3 Earthwork Paving, Grading, Site and Structural Concrete, Underground Utilities, Electrical Utilities )

Language of Materials

From the Collection: English

Location

Castle Warehouse, Large Shelf, B 15

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479