Construction, Equipment, Project Files, 2007
Scope and Contents
The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility will be located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock. The project is scheduled to be completed in time for Fall 2008.
The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility is located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock.
Dates
- Creation: 2007
Extent
1 folder (Field Orders Closeout Interstate Construction, Inc. Electrical Utilities Cost Estimates/General Contractor Transaction to Site Schedules Public Requests Test Reports Subcontractor's Substitution Partnering Meeting PTC Daily Reports PTC General Correspondence Payment Application & Progress Payment Chane Order Numerical Change Order Request Prime Contract Daily Reports Release of Retention (Surety) Final Payment/Full & Finals from Subcontractor Capital Improvement Budget Bid Summary and Docs Certified Payroll Baseline Construction Schedules/Corres. Correspondence: Other Consultants Correspondence: C.T.E. Testing Correspondence: O'Dell Final Cert: Water Flow/ Water Purification Final Cert: Building Pad Final Certification: Electrical Engineer Guarantee Defect Notices Waste Management Reports PTC Daily Reports PTC General Correspondence Change Order Numerical Prime Contract Fire Marshall Correction Reports)
Language of Materials
From the Collection: English
Location
Castle Warehouse, Cabinet 13, Drawer 1
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository