Drawings, Specifications and Submittals, 2014-01-31

 File — Container: Ref ID ref19_cxy

Scope and Contents

From the Collection:

The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility will be located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock. The project is scheduled to be completed in time for Fall 2008.

Scope and Contents From the Collection:

The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility is located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock.

Dates

  • Creation: 2014-01-31

Extent

3.3 Linear Feet (Transmittal Following 3 items Field Order #3 1/2 Size Drawings Written Narrative Floor Plan- Mezzanine Drawings Access and Intrusion Drawings Transmittal following 2 items Field Order 30 Bulletin 5 narrative and four full size sheets Fault Analysis input Data LSSF Bid Set Drawings LSSF Drawings Floor Plan UCM LSSF Tri Signal Specification Binder Fire Alarm Fire Marshall Stamped Drawings Submittal #63 Acme Construction Shop Drawings Submittal #47 Acme Construction Submittal #47.1 Binder Product Data and Shop Drawings Injury and Illness Prevention Program Acme Construction Short Circuit Protective Device Coordination 3 Binders 16010 Basic Electrical Requirements 16060 Grounding & Bonding 16132 Boxes 16313 Power Centers 16420 Motor Control )

Language of Materials

From the Collection: English

Location

Castle Warehouse Cabinet 13, Drawer 3