LSSF Drawings, 2014-01-31

 Item — Folder: Ref ID ref21_46u

Scope and Contents

From the Collection:

The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility will be located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock. The project is scheduled to be completed in time for Fall 2008.

Scope and Contents From the Collection:

The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility is located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock.

Dates

  • Creation: 2014-01-31

Extent

3.3 Linear Feet (LSSF Plumbing Plan Drawings HVAC Plan B&C ADD ALT #2 Plumbing Underground Plan LSSF Electrical Legend and General Notes HVAC Plan Fire Systems Drawing 3 Drawings Mechanical Drawings Electrical Drawings ACME Drawings )

Language of Materials

From the Collection: English

Physical Location

Castle Warehouse, Cabinet 13, Drawer 4

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository