The Joseph Edward Gallo Recreation and Wellness Center totals 24,985 asf (35,690 gsf). The project includes a gymnasium with bleachers, a student health and wellness center, sports instruction space, cardiovascular/weight training room, locker room, public lobby and reception, and a small administrative office suite.

Dates

  • Creation: 2013-06-12

Extent

3.3 Linear Feet (900140/5K Contractor Payments 900140/5K.1 Contractor Stop Notices 900140/5L Contractor Escrow Agreement 900140/5M.1 Correspondence: Other Consultants 900140/5N.1 Correspondence: Campus 900140/5P Notice of Non-Compliance 900140/5Q Inspection Reports: IOR 900140/5Q.1 Summary Inspection Reports: (IOR) 900140/5Q.2 Inspection Reports: IOR Correction Notices 900140/5R.1 Field Reports: Mechanical Inspection 900140/5R.2 Field Reports: Electrical Inspection 900140/5R.3 Field Reports: Design Professional Consultant 900140/5R.4 Field Reports: Campus Agencies 900140/5R.5 Project Report 900140/5S Archeology Issues 900140/5T Insurance 900140/5T.1 Builders Risk Policy 900140/5U Project Meeting Minutes/Correspondence 900140/5U.1 Partnering Meeting 900140/5U.2 Dispute Review Board 900140/5U.3 Other Construction Related Meetings 900140/5V Subcontractor’s List 900140/5V.1 Subcontractor Substitution 900140/5W Submittal Log 900140/5X Permits 900140/5X.1 Testing Reports: Concrete 900140/5X.2 Test Reports: Soil 900140/5X.3 Test Reports: Welding 900140/5X.4 Test Reports: Miscellaneous 900140/5X.5 Waste Management Reports 900140/5X.6 LEED Construction 900140/5X.7 Public Record 900140/5X.8 SWPPP 900140/5Y Cost Estimates/General Contractor 900140/5Z Transition To Site (T2S) R&W 900140/5Z.1 Transition To Site Schedules R&W 900140/6A Project Completion 900140/6A.1 Punch Lists 900140/6B Operations Manuals/Guarantees 900140/6B.2 Commissioning 900140/6C Guarantee Defect Notices 900140/6D.1 Certificates of (R&W) Completion/Notice of Completion 900140/6D Certificates of (R&W) TCO and Beneficial Occupancy)

Language of Materials

From the Class: English

Location

Castle Warehouse, Cabinet 22, Drawer 3