Construction Documents, 2013-06-28
Scope and Contents
The Joseph Edward Gallo Recreation and Wellness Center totals 24,985 asf (35,690 gsf). The project includes a gymnasium with bleachers, a student health and wellness center, sports instruction space, cardiovascular/weight training room, locker room, public lobby and reception, and a small administrative office suite.
Dates
- Creation: 2013-06-28
Extent
3.3 Linear Feet (900140/5B Certified Payroll Landavazo Bros., Inc. 900140/5B Certified Payroll McFadden Construction, Inc. 900140/5B Certified Payroll Mid-State Steel Erectors 900140/5B Certified Payroll O'Dell Engineering 900140/5B Certified Payroll Pacific West Controlls 900140/5B Certified Payroll Petersen Dean Commercial, Inc. 900140/5B Certified Payroll Rex Moore Electrical 900140/5B Certified Payroll SLK Construction 900140/5B Certified Payroll Sacramento Glazing 900140/5B Certified Payroll Tri-Signal Integration 900140/5B Certified Payroll Turman Commercial Painters 900140/5B Certified Payroll Viking Automatic Sprinkler 900140/5B Certified Payroll Western Building Materials 900140/5C Field Orders 900140/5D Change Order Request 900140/5E Change Orders Denied/Cancelled 900140/5O Correspondence: Contractor 900140/5F Change Order Numerical Potential Change Order (PCO) #001-122 900140/5H Letters of Instruction 900140/5I RFI (Request for Information) 900140/5J Construction Schedules 900140/5J.1 Construction Schedules/Corresp. 900140/5J.2 Construction Schedules (Weekly Lookahead))
Language of Materials
From the Class: English
Location
Castle Warehous, Cabinet 22, Drawer 2
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository