W.H. Gibbs TPK 20 Final Clean (WHG)
Scope and Contents
Project contains 10,847 gross square feet (gsf) and 8,224 assignable square feet (asf). Project is adjacent to existing campus dining facility and proximate to two campus housing projects. The combined dining facility will serve about 1,000 resident students in addition to staff, faculty and visitors. Project increases campus dining capacity from 345 to 668 seats (504 indoor and 164 outdoor seats)
Dates
- Creation: Between 2007 to 2008
Extent
23 folders (Folder summary: 1U CFM Correspondence 3D Value Engineering Cost Savings & Time Savings (no contents) 5A PTC Prime Contract Documents 5C Field Order Documents & Field Directives (no contents) 5D Change Order Request (no contents) 5G Potential Change Order Corres. (no contents) 5H Letter of Instruction Corres. & Notification (no contents) 5I RFI Corres. & Notification (no contents) 5J Schedule Baseline, Updates 3 week look ahead corres. 5J.1 Correspondence to PTC for Schedule Starts, Manpower Completion (no contents) 5K Payment Application & Progress Payment Corres 5M Bulletin Notification & Correspondence (no contents) 5O Prime Trade Contractor General Corres. 5P Inspection Correspondence (no contents) 5PA Daily Reports (no contents) 5Q Inspection Correction Correspondence (no contents) 5U.1 Letters & Notices of Delays (no contents) 5V 2nd Tier Contracts & Purchase Order Documentation 5W Submittal & Procurement Correspondence (no contents) 5X.6 LEED Correspondence (no contents) 6A.1 Punchlist Correspondence (no contents) 6B.2 Commissioning Correspondence (no contents) 6B Closeout Correspondence (no contents))
Language of Materials
English
Physical Location
Castle Warehouse, Cabinet 12, Drawer 2
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository