Design and Construction Documents Miscellaneous, 2003 - 2006

 File — Container: Ref ID ref37_rk6

Scope and Contents

From the Collection:

The Science and Engineering Building provides about 110,000 assignable square feet within a total area of 234,000 gross square feet, for research laboratories, laboratory support, teaching laboratories and offices for the natural sciences and engineering divisions. The building also includes administrative office space for the divisional deans. The building consists of two three-story bars organized in plan to form an L shape. A partial basement beneath the intersection of the bars, will house the campus vivarium and a mechanical space in the roof will house the buildings mechanical equipment. Class laboratories and support spaces are all located on the ground floor. The second and third floors contain the research laboratories and support space, as well as faculty and administrative offices. The bars of the building with the greatest solar exposure are shaded with a three-story-high screened circulation area.

Dates

  • Creation: 2003 - 2006

Extent

3.3 Linear Feet (100% Specifications, Volume 2 of 2, Divisions 15-17 100% Specifications, Volume 1 of 2, Divisions 2-14 (DSA stamped) Miscellaneous construction photos ARUP Field Observation report (1/27/2005) 2 CDs (UCM Photos and Remaining damanged & defective work - 3/19/2007) Change orders (40621, 40651, 40602, 40351, 40235) Miscellaneous Correspondence between Gary Knox, Flintco & Hallmark Group Proforma Bidding Documents (Flintco) CM/Contractor Documents, August 2003, Bid Documents Site Logistics Plan National Pollutant Discharge Elimination System, SWPPP Site and Infrastructure Phase 1 Monthly project update reports, Hallmark Group (March & April 2003) Monthly activity report, McCarthy (5/12/2003) Monthly project update reports, Flintco (9 volumes, Between February 2003 and October2004) Flintco summary report, 5/17/2007 Miscellaneous correspondence with Flintco 100% Construction Documents Electrical Panel Schedules 100% Specifications, Selected Divisions, Addendum 3 Inspection requests binder Design Package 1 (volumes 1 and 2 of 6) Bulletin 32R, issued to Flintco, 5/12/2005 Miscellaneous correspondence with Hallmark Group ARUP Field Observation Reports (3 volumes, April 2006) )

Language of Materials

From the Collection: English

Location

Castle Warehouse, Cabinet 19, Topshelf

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository