Skip to main content

Design and Construction Documents Miscellaneous, 2013-05-17

 File — Container: Ref ID ref26_w2f

Scope and Contents

From the Collection:

The Science and Engineering Building provides about 110,000 assignable square feet within a total area of 234,000 gross square feet, for research laboratories, laboratory support, teaching laboratories and offices for the natural sciences and engineering divisions. The building also includes administrative office space for the divisional deans. The building consists of two three-story bars organized in plan to form an L shape. A partial basement beneath the intersection of the bars, will house the campus vivarium and a mechanical space in the roof will house the buildings mechanical equipment. Class laboratories and support spaces are all located on the ground floor. The second and third floors contain the research laboratories and support space, as well as faculty and administrative offices. The bars of the building with the greatest solar exposure are shaded with a three-story-high screened circulation area.

Dates

  • Creation: 2013-05-17

Extent

3.3 Linear Feet (Lawsuit Documents 10/2005 900000/1E DPP (Detailed Project Program) 900000/1E.1 Design Guide (x2) 900000/1E.1 Design Guide UC Davis Standards & Design Guide 900000/1F Capital Planning Committee Corresp/Minutes (x2) 900000/1F.1 Programming Consultant Corresp 900000/1G Environmental Compliance 900000/1G.1 Archeological Issues 900000/1H Site Planning Evaluation 900000/1H.1 Surveys 900000/1H.2 Utilities 900000/1H.3 Building Code 900000/1H4 Area Calculations 900000/1H.5 Structural Calculations 900000/1H.6 Energy Calculations 900000/1I Soils Report 900000/1J Cost Estimates Cummings 900000/1J Cost Estimates Design Estimate 900000/1J Cost Estimates 900000/1J Cost Estimates Degenkolb 900000/1J Cost Estimates Hanscomb-Design Docs 900000/1J Cost Estimates Hanscomb-Schematic Design 900000/1J Cost Estimates Hanscomb-Construction Docs 900000/1J Cost Estimates Engineering Enterprise 900000/1J Cost Estimates CM/CG 900000/1J Cost Estimates Internal Estimate 900000/1K Office of the President/Corresp 900000/1L Regents Items 900000/1M Dept. of Finance Submissions/SPWS (State) (x2) 900000/1N DSA-Access Compliance 900000/1O Asbestos Survey/Corresp 900000/1P Equipment 900000/1Q Corresponence Client 900000/1R Correspondence Campus 900000/1S Correspondence Consultant 900000/1T Office of the General Counsel 900000/1U Fire Marshal (x2) 900000/1U.1 Fire Marshal Corrections 900000/1V LEED Documentation 900000/1W PG&E Savings by Design 900000/1X City/County Correspondence 900000/2A Design Professional Selection 900000/2B Design Professional Agreements 900000/2C Other Consultant Agreements-CTS, 4 Leaf 900000/2C Other Consultant Agreements-Cermak, Peterka, Petersen, Inc. (CPP) 900000/2C Other Consultant Agreements-Cumming, LLC 900000/2C Other Consultant Agreements-Degenkolb Engineers 900000/2C Other Consultant Agreements-DBI-Inspection Services & Code Consultants 900000/2C Other Consultant Agreements-Davis Langdon Adamson (DLA) 900000/2C Other Consultant Agreements-Ove Arup & Parners, CA LTD. 900000/2C Other Consultant Agreements-Skidmore, Owings & Merrill, LLP 900000/2C Other Consultant Agreements-Taylor Engineering 900000/2C Other Consultant Agreements 900000/3A Correspondence-Design Professional (x2) 900000/3A.1 Correspondence-Other Consultants (x2) 900000/3B Correspondence-Campus 900000/3B.1 Correspondence-Users 900000/3C Building Advisory Committee 900000/3C.1 Misc Meeting Notes 900000/3D Value Engineering 900000/3E Review Comments-Schematic Design Phase 900000/3E.1 Review Comments-Design Development (DD) Phase 900000/3E2 Review Comments-Construction Documents Phase (CD) 900000/3E.3 Revisions/Bulletins to Drawings Clarification)

Language of Materials

From the Collection: English

Location

Castle Warehouse, Cabinet 19, Drawer 1

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479