Contract Documents, Improvements Drainage Pipe Installation, 2007
File — Container: Ref ID ref88_mdf
Scope and Contents
From the Collection:
Change Order to Housing and Dining project. Design Build WC combined. This project provides food service facilities for students, faculty, staff and visitors. The project constructs the core and shell facility for dining (11,050 asf), as well as provide additional tenant improvements for the adjacent convenience store (1,000 asf) and a small operation to be located within the Library/Information Technology Center (700 asf).
Dates
- Creation: 2007
Creator
- BeeBee Corporation (Organization)
Extent
1 volume
Language of Materials
English
Physical Location
Castle Warehouse, Cabinet 14, Topshelf
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository