Close-Out Bid Packages
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: December 2006
Extent
7 volume (Bid Package "I" "Padre and Sons" (Irrigation) Prime Trde Contractor Close-out Documentation Bid Package "H" "Jos. Albanes" (Site concrete) Prime Trde Contractor Close-out Documentation Bid Package "J" "Brown Sheet Metal" (Mtl. railings and bollards) Prime Trde Contractor Close-out Documentation Bid Package "K" "Western Steal" (Signage) Prime Trde Contractor Close-out Documentation Bid Package "M" "Jos Albanese" (Concrete) Prime Trde Contractor Close-out Documentation Bid Package "O" "Collins Electric" (Electrical) Prime Trde Contractor Close-out Documentation Prowest Correspondence and Directives)
Language of Materials
From the Class: English
Location
Castle warehouse, Cabinet 3, Top
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository