Prequalification Documents
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: December 2006
Extent
1 box (01 12 00 .19 Electrical and Fire Alarm 01 12 00 .20 Site Concrete and Asphalt Paving 01 12 00 .21 Landscape, irrigation, and site furnishing 01 12 00 .22 Rough carpentry 01 12 00 .23 Cabinets and finish carpentry 01 12 00 .24 Door frames hardware and installation 01 12 00 .25 Lath and plaster 01 12 00 .26 Accoustical ceiling 01 12 00 .27 Ceramic tile 01 12 00 .28 Floor covering 01 12 00 .29 Painting 01 12 00 .30 Specialities 01 12 00 .31 Blinds and window coverings 01 12 00 .32 Specialties)
Language of Materials
From the Class: English
Location
Castle warehouse, Cabinet 3, Top
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository