Contract, Construction, and Bidding Documents

 File — Container: Ref ID ref23_p7o

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: December 2006

Extent

7 Volumes (Bid Package H- Site Concrete (East): Joseph Albanese, Inc. Vol. 2 of 2 Bid Package I- Landscape & Irrigation: Padre & Sons Landscaping Bid Package J- Metal Railings & Bollards: Brown Sheet Metal & Mechanical, Inc. Bid Package K- Site Signage: Wester Seal, Inc. Bid Package L-Landscaping: Clearwater Landscaping Specs, BP L-O, Divisions 2-17 Bid Package M- Site Concrete (S&E): Joesph Albanese, Inc.)

Language of Materials

From the Class: English

Location

Castle Warehouse, Cabinet 2, Drawer 4

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US